Cerro Los Gatos

Completed for Minera Plata Real in Mexico, the Cerro Los Gatos project involved paste reticulation design and laboratory testwork to support the development of an efficient underground backfill system.

Project Details

Client:

Newcrest Mining Limited

Location:

Mexico

Scope:

Paste Reticulation Design and Testwork Programme

Duration:

6 Months

Budget:

US$60K

Project Overview

Supporting backfill system development through design and testing

In 2021, MineFill completed the paste reticulation design and laboratory testwork programme for the Cerro Los Gatos mine in Mexico. The project focused on generating the technical information required to support detailed flow modelling and paste mix design.

Through laboratory testing and engineering analysis, MineFill provided key inputs that assisted in the development of an effective paste reticulation system aligned with the project’s operational requirements.

2021

Project completed

Project duration
0 months

US$60K

Project budget

MineFill combined laboratory testing and engineering design expertise to support the development of a practical paste reticulation solution.

Project Details

The Cerro Los Gatos project required a detailed understanding of paste performance characteristics to support the design of a reliable reticulation network.

Accurate testwork and engineering analysis were essential to ensure the proposed system could meet operational requirements while supporting future mine development.

MineFill delivered a comprehensive laboratory testwork programme alongside paste reticulation design services for the project.

The testing data was used to support detailed flow modelling, while engineering assessments helped establish the parameters required for paste mix design and system development.

The completed programme provided valuable technical inputs for the ongoing design and optimisation of the Cerro Los Gatos paste backfill system.

By combining laboratory testing with specialist engineering expertise, MineFill helped establish a strong foundation for future project development.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.

Contact MineFill

Need a partner in mine backfill solutions?

Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.