Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.
Client:
Alkane Resources Ltd
Location:
New South Wales
Scope:
Engineering, Procurement & Construction
Duration:
20 Months
Budget:
AU$29M
MineFill was engaged from the early consulting and study stages to help define the optimal backfill strategy and plant configuration for the Tomingley operation. This early involvement allowed key design decisions to account for site-specific requirements, production targets and long-term operational objectives.
Paste delivery
MineFill was engaged from the early consulting and study stages to help define the optimal backfill strategy and plant configuration for the Tomingley operation.
Key design decisions needed to account for site-specific requirements, production targets, filtration strategy, paste density, underground distribution and long-term operational objectives.
MineFill delivered a turnkey paste plant solution incorporating an 11 km overland tailings pipeline, deslime cyclones, a 109 m² vacuum belt filter and an integrated paste mixer-hopper.
The system was designed to deliver paste underground at throughput rates of 65–85 m³/h via gravity, with a process performance guarantee to provide confidence in long-term operational performance.
The completed Tomingley Paste System demonstrates MineFill’s ability to take a project from early study involvement through to complete EPC delivery.
Through process evaluation, mass balance optimisation and practical engineering, MineFill delivered a reliable paste plant designed to improve safety, commissioning efficiency, plant availability and underground backfill performance.
Australia
Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.
Australia
Completed for Newmont Limited in Western Australia, the Telfer Rey Paste Backfill System showcases MineFill’s EPC delivery of a reclaim tailings paste plant integrated into an existing hydraulic fill operation.
Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.