Great Bear Project

Completed for Kinross Gold Corporation, the Great Bear Project highlights MineFill’s expertise in pre-feasibility studies, testwork and backfill strategy development for emerging underground mining operations.

Project Details

Client:

Kinross Gold Corporation

Location:

Canada

Scope:

Pre-Feasibility Study and Testwork

Duration:

8 Months

Budget:

US$150k

Project Overview

Pre-feasibility studies and testwork supporting the Great Bear Project

In 2024, MineFill Services completed the backfill component of a pre-feasibility study for the Great Bear Project in Canada on behalf of Kinross Gold Corporation.

The study included both paste fill and cemented rock fill testwork to evaluate potential backfill strategies capable of supporting the proposed underground mining operation. Detailed testing and engineering assessments were undertaken to determine the most suitable approach for future mine development.

The results identified that a combination of cemented rock fill and paste fill would be required to meet the project’s production and mining requirements, providing a practical foundation for ongoing project planning and development.

2 Backfill Methods

Paste fill and cemented rock fill assessed

Project duration
0 months

US$150k

Project budget

MineFill delivered backfill studies, testing and engineering assessments to support the Great Bear Project pre-feasibility study.

Project Details

The Great Bear Project required a comprehensive assessment of potential backfill options to support future underground mining operations. The study needed to evaluate multiple backfill methodologies and determine a solution capable of meeting both production and geotechnical requirements.

MineFill completed a detailed program of paste fill and cemented rock fill testwork, supported by engineering analysis and feasibility assessments. The study examined the performance and suitability of each backfill method to identify the optimal strategy for future mine development.

The pre-feasibility study established that a combination of cemented rock fill and paste fill would best support the proposed mining operation. The findings provided valuable technical input for future project planning and demonstrated MineFill’s capability in early-stage backfill studies and testwork programs.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.

Contact MineFill

Need a partner in mine backfill solutions?

Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.