Delivered for Rio Tinto in the USA, the Resolution Copper Project highlights MineFill’s expertise in feasibility studies, laboratory testing and backfill system design for large-scale underground mining developments.

Project Details

Client:

Rio Tinto

Location:

USA

Scope:

Pre-Feasibility Study (Backfill Portion Only)

Duration:

12 Months

Budget:

US$750,000

Project Overview

Supporting a major underground mining project through feasibility and backfill engineering

In 2021, MineFill Services was engaged to support the backfill component of the Resolution Copper Pre-Feasibility Study. The project involved reviewing previous studies, assessing existing design assumptions and calculations, and contributing specialist backfill expertise to the broader study programme.

MineFill also completed extensive laboratory investigations and feasibility-level engineering work, including the development of capital and operating cost estimates to support project evaluation and decision-making.

2021

Project completed

Project duration
0 months

US$750K

Project budget

MineFill provided specialist backfill engineering, laboratory testing and feasibility study support for one of the world’s most significant underground mining developments.

Project Details

The Resolution Copper Project required detailed assessment of the proposed backfill strategy as part of a broader pre-feasibility programme.

The scope involved reviewing existing technical studies, validating design assumptions and developing the engineering information required to support future project planning and investment decisions.

MineFill undertook a comprehensive review of previous studies, design criteria and engineering calculations relating to the backfill system.

This work was supported by extensive laboratory investigations and feasibility-level engineering design, including the preparation of capital and operating cost estimates to assist with project evaluation.

MineFill’s contribution provided valuable technical insight into the backfill requirements of the Resolution Copper Project and supported the advancement of the pre-feasibility study.

Through a combination of laboratory testing, engineering analysis and cost modelling, MineFill delivered the information required to assist future project development and decision-making.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.

Contact MineFill

Need a partner in mine backfill solutions?

Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.