Skouries Project

Delivered for the Skouries Project in Greece, this feasibility study demonstrates MineFill’s ability to develop innovative and scalable backfill solutions that support both project start-up requirements and future operational expansion.

Project Details

Client:

Eldorado Gold (Skouries Project)

Location:

Greece

Scope:

Feasibility Study

Duration:

6 Months

Budget:

AU$0.3M

Project Overview

Developing a scalable backfill solution for future mine growth

In 2024, MineFill completed a feasibility study for the paste backfill component of the Skouries Project in Greece. The study focused on developing an efficient backfill solution capable of meeting initial production requirements while providing a clear pathway for future expansion.

Through an innovative dewatering approach, MineFill developed a modular paste plant concept that satisfied start-up backfill demands and could be expanded within the same footprint as production requirements increased.

2024

Project completed

Project duration
0 months

AU$0.3M

Project budget

MineFill delivered a feasibility-level backfill solution designed to balance operational flexibility, efficiency and future expansion requirements.

Project Details

The Skouries Project required a paste backfill solution capable of supporting start-up mining operations while remaining adaptable to future increases in production demand.

The challenge was to develop a practical design that minimised initial capital requirements while allowing seamless expansion as the operation matured.

MineFill completed a feasibility study focused on the paste backfill system and developed an innovative dewatering strategy to support plant design.

The resulting concept featured a modular and expandable paste plant layout that could satisfy initial backfill requirements and later be expanded within the same footprint to accommodate increased production rates.

The completed study provided a scalable backfill solution that aligned with both the immediate and long-term objectives of the Skouries Project.

By combining feasibility engineering with innovative plant design thinking, MineFill delivered a practical pathway for future growth while maintaining operational flexibility.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.

Contact MineFill

Need a partner in mine backfill solutions?

Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.