Completed for Global Atomic Corporation, the Dasa Uranium Mine project demonstrates MineFill’s expertise in feasibility studies, system integration and paste backfill design for complex underground mining operations.
Client:
Global Atomic Corporation
Location:
West Africa
Scope:
Paste Backfill Feasibility Study
Duration:
6 Months
Budget:
US$120,000
In 2022, MineFill Services completed a paste backfill feasibility study for the Dasa Uranium Mine in West Africa on behalf of Global Atomic Corporation.
The study involved a comprehensive review of previous technical reports and assessments to develop a suitable paste backfill strategy for the operation. MineFill evaluated mining methods, paste testwork requirements, paste plant design and underground reticulation infrastructure to establish an integrated backfill solution.
The feasibility study considered both surface and underground system requirements, ensuring seamless integration with the broader mine and process plant design. The resulting work provided the technical framework required to support future project development and operational planning.
Surface and underground systems reviewed
Project budget
The Dasa Uranium Mine required a backfill solution that could be effectively integrated into the broader mine development strategy. The project demanded a detailed assessment of mining methods, paste plant infrastructure and underground reticulation requirements while ensuring compatibility with planned processing facilities.
MineFill undertook a detailed review of previous technical studies and completed a feasibility assessment covering all aspects of the proposed paste backfill system. This included evaluation of paste testwork requirements, surface plant design, underground reticulation infrastructure and system integration across the mining operation.
The completed study established a practical pathway for implementing paste backfill at the Dasa Uranium Mine. The work provided key engineering recommendations, design criteria and integration strategies to support future project development and investment decisions.
Australia
Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.
Australia
Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.
Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.