Delivered for Mount Isa Mines (Glencore), the George Fisher Plant Upgrades project involved a staged infrastructure study and detailed design programme aimed at improving paste backfill capacity, reliability and long-term operational performance.
Client:
Mount Isa Mines (Glencore)
Location:
Queensland, Australia
Scope:
Infrastructure Feasibility Study
Duration:
18 Months
Budget:
AU$700,000
In 2022/23, MineFill completed a paste backfill infrastructure study for the George Fisher mine, assessing the requirements for upgrades to the existing backfill facilities.
The study was delivered in two phases. The initial review identified recommended upgrades to both the Blob and South Paste plants, providing the basis for further development.
The second phase progressed to detailed design for significant upgrades to the Blob paste plant, together with the development of an entirely new South Paste plant.
Project completed
Project budget
The George Fisher operation required upgrades to its existing paste backfill infrastructure to support ongoing operational requirements.
The project needed to assess the existing Blob and South Paste plants, identify upgrade requirements and establish a pathway for significant improvements to the site’s backfill facilities.
MineFill undertook the study in two phases, beginning with an initial review of the existing paste infrastructure and recommended upgrades to both the Blob and South Paste plants.
The second phase progressed the recommendations into detailed design, including significant upgrades to the Blob paste plant and the development of a new South Paste plant.
The completed study provided a clear technical pathway for upgrading the George Fisher paste backfill infrastructure
MineFill’s work progressed from an initial infrastructure assessment through to detailed design, supporting the future development of both the existing Blob plant and new South Paste plant.
Australia
Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.
Australia
Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.
Talk to MineFill about your next study, EPC project or operational backfill challenge. Our team can support your project from early-stage planning through to complete system delivery.