Jabal Sayid Site

Delivered for Ma’aden Barrick Copper Company in Saudi Arabia, the Jabal Sayid project involved the detailed engineering and design of a paste reticulation system, supporting the reliable transport of backfill material across both surface and underground infrastructure.

Project Details

Client:

Ma’aden Barrick Copper Company

Location:

Saudi Arabia

Scope:

Engineering, and Underground Reticulation Design

Duration:

18 Months

Budget:

AU$700,000

Project Overview

Designing a large-scale paste reticulation system for underground operations

In 2023, MineFill completed the detailed engineering and design of a paste reticulation system for the Jabal Sayid mine in Saudi Arabia. The project included the design of a 1,200-metre overland paste pumping system together with both surface and underground reticulation infrastructure.

The scope required a coordinated engineering approach to ensure reliable paste transport while supporting the operational requirements of the mine’s underground backfill system.

Overland paste pipeline designed
0 m
Project duration
0 months

AU$700K

Project budget

MineFill delivered detailed engineering and reticulation design expertise to support the successful development of paste backfill infrastructure across the operation.

Project Details

The project required the design of an integrated paste reticulation system capable of transporting material efficiently between surface facilities and underground mining areas.

The inclusion of a 1,200-metre overland pumping system introduced additional engineering considerations around system reliability, routing and long-term operational performance.

MineFill provided detailed engineering services covering both surface and underground reticulation networks, ensuring a coordinated approach across the entire backfill distribution system.

The design incorporated the overland paste pumping infrastructure and supporting reticulation components required to deliver paste safely and efficiently throughout the operation.

The completed engineering package provided the foundation for the implementation of a reliable paste reticulation system tailored to the operational requirements of the Jabal Sayid mine.

Through specialist backfill engineering expertise, MineFill delivered a practical solution that supported the project’s long-term underground mining objectives.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.