Completed for Newmont Limited in Western Australia, the Telfer Rey Paste Backfill System showcases MineFill’s EPC delivery of a reclaim tailings paste plant integrated into an existing hydraulic fill operation.

Project Details

Client:

Newmont Limited

Location:

Western Australia

Scope:

Engineering, Procurement & Construction

Duration:

15 Months

Budget:

AU$12M

Project Overview

A reclaim tailings paste plant integrated into an existing hydraulic fill system

In 2024, MineFill completed the Telfer Rey Reclaimed Backfill System for Newmont Limited in Western Australia. The project involved integrating a reclaim tailings paste plant module into an existing hydraulic fill plant to achieve paste output of 80m³/h.

Paste output
0 m³/h
Project duration
0 months

AU$12M

Project budget

MineFill delivered an integrated paste backfill solution designed to operate within an existing hydraulic fill plant and challenging underground delivery environment.

Project Details

The project required the integration of a reclaim tailings paste plant module into an existing hydraulic fill plant, creating a need for careful design, planning and system coordination. Paste also needed to be delivered via an overland pumping system, down the main ore shaft and through a challenging underground reticulation system.

MineFill delivered the engineering, procurement and construction of the paste backfill system, integrating the new reclaim tailings paste plant module into the existing operation. The project included underground reticulation design, a technical backfill operational system and an EPC contract supported by process performance guarantees.

The completed Telfer Rey Paste Backfill System demonstrates MineFill’s capability to deliver complex backfill upgrades and integrated paste plant solutions within existing mining infrastructure.

The system was designed to achieve 80m³/h paste output while supporting reliable paste delivery from the surface plant through to underground stopes.

More Projects

Explore more MineFill projects

Australia

Completed for Gold Fields in Western Australia, the Invincible Reclaim Paste Backfill System showcases MineFill’s EPC delivery of a modular greenfield paste plant.

Australia

Delivered for Alkane Resources, the Tomingley Paste System showcases MineFill’s integrated approach from early studies to complete EPC delivery.